Our Projects - Sanford Electrical Contractors
Our experienced electricians always go above and beyond for our clients, ensuring that they get the quality workmanship and exceptional service combination that has kept SEC at the top of the industry since 1977. Our dedication to adhering to our core values that keeps repeat customers a substantial part of SEC's business.
Motor Control Center
This is a project we completed for a long time customer. This project involved removal of existing motor control center that provided power to the main water supply and install of new motor control center. Total shutdown time was on this project was 4 hours. The customer was very pleased with the project.
Additional Photos (click for slideshow)
Dual Motor Control Center
This project was also a customers main motor control center for two townships that share the same water supply. This project consisted of two existing motor control centers housing 5 large split case pumps among sourcing power for other entities within. In total this was a 2000 amp service. Total shutdown time from removal to reinstall and startup was 2.5 days while ensuring operation of 2 existing pumps for water system maintained operation during shutdown. Customer was very pleased with project.
Additional Photos (click for slideshow)
Pump Automation - Generator Backup
This is a project a customer need for a specialized project that consisted of supplying a 1200 amp temporary service with generator backup, 3 variable speed drives and communications to allow for total automatic operation of pumps and station while all electrical components within sewer lift station were replaced. Job took place within a flood plain which required our service to be elevated as seen. Customer was very happy with results especially being able to evade diesel powered bypass for 3 months.